Coiled tubing installation

Coiled tubing system is a set of portable units used to introduce and withdraw the continuous tubing in a column of natural gas wells in the execution of special operations.

The most common operations performed with the tubing system are: washing the solid deposit of probes, milling, cement and other debris, stimulate productive layers, Nitrogen bump, cementing.
The system is mounted and transported on two trucks, as follows:

 

coiled_tubing_installation